Bottle details and recorded prices
Dom Pérignon, Rosé 2009 Wine (75cl)
A 2009 sparkling wine from Champagne, made from Pinot Noir and Chardonnay.
| Producer | Dom Pérignon |
|---|---|
| Vintage | 2009 |
| Wine style | sparkling |
| Grape | Pinot Noir, Chardonnay |
| Region | Champagne |
| Bottle size | 750ml |
Prices stay local
Prices by country
Choose a country for its shops and currency. We keep currencies separate.
Sources and bottle details
These are the source records behind the bottle details, vineyard links and shop prices. A regional name alone cannot identify a vineyard.
- Bottle identity
- Catalogue bottle details
These are the bottle details supplied to the catalogue. Missing fields are left blank.
Bottle · grape · place
Grape profile
The wine
Dom Pérignon, Rosé 2009 Wine (75cl) is recorded as a 2009 sparkling wine made from Pinot Noir and Chardonnay in Champagne.
Typical grape profile: Pinot Noir — Red fruit (cherry, cranberry, red plum), earthy and floral notes, silky texture; Chardonnay — Ranges from crisp and citrussy (unoaked) to rich, buttery and vanilla-scented (oaked). The finished bottle can differ with vintage and winemaking.
Growing-temperature context
For general cultivar-level heat guidance, see the Pinot Noir and Chardonnay growing profiles. BottlePicker does not apply a generic range to this bottle without a verified vineyard link.
Recorded price observations
Earlier prices from the named shops. Each date is the day that price was seen, not confirmation of stock today.
| Observed | Market | Retailer | Recorded price |
|---|---|---|---|
| 2026-07-14 | uk | Honest Grapes | GBP 304.3 |
Daily recorded price history
The latest 90 records, newest first. Low and high refer to the prices collected in that country and currency on that date. Delivery is extra.
| Observed | Market | Currency | Recorded low | Recorded high | Retailers |
|---|---|---|---|---|---|
| 2026-11-23 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-22 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-21 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-20 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-19 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-18 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-17 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-16 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-15 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-14 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-13 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-12 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-11 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-10 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-09 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-08 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-07 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-06 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-05 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-04 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-03 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-02 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-11-01 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-31 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-30 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-29 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-28 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-27 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-26 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-25 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-24 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-23 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-22 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-21 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-20 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-19 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-18 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-17 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-16 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-15 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-14 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-13 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-12 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-11 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-10 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-09 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-07 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-06 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-05 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-04 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-03 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-02 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-10-01 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-30 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-29 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-28 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-27 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-26 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-25 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-24 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-23 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-22 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-21 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-20 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-19 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-18 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-17 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-16 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-15 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-14 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-13 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-12 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-11 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-10 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-09 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-08 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-07 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-06 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-05 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-04 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-03 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-02 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-09-01 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-08-31 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-08-30 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-08-29 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-08-28 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-08-27 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-08-26 | uk | GBP | 304.30 | 304.30 | 1 |
| 2026-08-25 | uk | GBP | 304.30 | 304.30 | 1 |
Official US label evidence
Historical Texas label approval
One official label approval has the same normalised product name as this BottlePicker record. These approvals pre-date September 2021 and help check identity, stated ABV and the responsible trade name; they do not prove that the current bottle has the same formula, remains registered or is available in Texas.
| Approved label | Type | Approved | ABV | Trade name | TTB record |
|---|---|---|---|---|---|
| DOM PERIGNON ROSE' (official certificate PDF opens in a new tab) | Wine | 2014-09-10 | 12.5% | MOET HENNESSY USA INC. | 14198001000018 (TTB record opens in a new tab) |
Matched by exact normalised product name; no label artwork is copied. Source: Texas Alcoholic Beverage Commission approved labels (opens in a new tab) via the Texas Open Data Portal. The portal does not specify a reuse licence for third-party label artwork, so BottlePicker links to the official PDF and publishes attributed factual extraction only. No state endorsement is implied.
Read the retailer’s description
The description below is the retailer’s own wording.
Dom Pérignon Rosé 2009 is a magnificent expression of prestige rosé Champagne, showcasing the house's dedication to elegance, intensity, and harmony. Crafted from a blend of Pinot Noir and Chardonnay, this vintage benefits from an exceptional growing season in 2009, marked by warm weather and a generous harvest. This rosé is a perfect accompaniment to dishes like duck breast, lobster, or creamy cheeses. While already displaying impressive complexity, it has the structure and depth to age gracefully for decades, rewarding patience with even greater refinement and nuance.